Project under construction
We have a portfolio of projects totalling 600 MW of power
Photovoltaic solar power plant in Tordesillas, Spain
Municipality of Valladolid, Castilla y León

MW of installed capacity
hectares
solar panels
“These projects in Tordesillas mark a milestone for Dos Grados to enter the Iberian market and contribute to strengthening our portfolio of 600 MW in sustainable energy assets.”
Job creation
Creation of direct, indirect and induced jobs:
- +460 jobs during construction phase
- +60 jobs during the operation phase (30 years)
Emissions avoided
AvoidedCO2 emissions: 790,882 Tons.
- Equivalent to emissions captured by 13,343 hectares of forest
- Equivalent to a vehicle fleet of more than 15,000 cars
Production of clean electricity
Clean electricity generation: 206 GWh/year.
- Equivalent to the consumption of 58,857 households.
Our commitment to the territory
- At Dos Grados we understand that each renewable installation must also generate a positive impact on its surroundings. Therefore, in Tordesillas, as in other municipalities where we operate, we are actively committed to the social and economic development of the territory:
- We prioritize the incorporation of local talent in the construction and operation phases.
- We collaborate with educational centers to promote technical knowledge
- We promote training programs adapted to the needs of the renewable energy sector.
- We promote alliances with suppliers in the municipality and the region.
- We support initiatives that promote innovation, energy efficiency and the improvement of the local economic fabric.
News
Dos Grados promotes sustainability at the IV Economic CyL Forum
At the 4th Sustainability Forum of Castilla y León Económica, the company presented its initiatives to promote biodiversity, local employment and land regeneration. Within the...